AESQ Documents - Supplemental Material

Committed to Quality

AESQ™ standards address problem solving, inspection frequency, measurement systems, PFMEA, and process control.

AESQ Supplementary Materials

These supplementary guidance documents, forms and checklists are provided for users to download and utilize in conjunction with the standard specified. The associated standard can be obtained from the Standards web page of this website. This material is derived from the specified standards, which is copyrighted property of the AESQ Strategy Group™, a program of SAE Industry Technologies Consortia®

AESQ Reference Manuals (RM) Supporting SAE AS13100 Standard

This series of AESQ Reference Manuals (RM) supporting the SAE AS13100™ Standard was developed by a group of Senior Industry Specialists from leading Aerospace companies to aid in the deployment of AS13100.

Each Reference Manual is available below for free download along with their respective Forms listed individually.

 

AesqRm13000.png

RM#
Reference Manual and Forms
Issue Date
Alternate Inspection Frequency Plans
March 8,2021
Measurement Systems Analysis
May 17,2021
Defect Prevention Quality Tools
March 25,2021
Sub Tier Management
March 8,2021
Design Work
March 8,2021
Compliance Assessment
March 8,2021
Rework and Production Repair of Non-Conforming Products
March 15,2021
First Article Inspection
March 15,2021
Advanced Product Quality Planning (APQP) and Production Part Approval Process (PPAP)
March 15,2021

AESQ "Management of Key Date Related Approvals" Guidance Documents

About these Guidance Documents

Revised 15 September 2020

This set of guidance documents has been created to support suppliers in the Aerospace engine supply chain during the COVID-19 pandemic by the AESQ group of companies. The guidance is based on customer specifications and industrial body published guidance where possible.

This is a set of guidance documents about the COVID-19 pandemic where Revision 1 covered the period from January 2020 through to 30 September 2020, Revision 2 extends this guidance to 31 December 2020. No further extensions to this guidance will be given and compliance to industry standards is expected on or before 31 December 2020.

These documents are guidance only – industrial bodies, international standards and customer specifications may have alternate requirements, and these should always take priority.

The normal order of document hierarchy and precedence for requirement flow-down still applies, and this guidance may be referred to within each organization's applicable documents.

CoverRevisionCalibration09172020_300.png

Name
Format
File
AS13000 Problem Solving Requirements for Suppliers
Word
AS13000FR Exigences en résolution de problèmes pour les fournisseurs
Word
AS13002 Requirements for Developing and Qualifying Alternate Inspection Frequency Plans
Excel
AS13003 Measurement Systems Analysis Requirements for the Aero Engine Supply Chain
Excel
AS13004 Process Risk Identification, Assessment, Mitigation and Prevention
Excel
A Practitioner’s Guide to Deploying AS13004 to Achieve Zero Defects
PDF
AS13006 Process Control Methods - Appendix B – Assessment Checklist
Excel
AS13006 Process Control Methods – Appendix C – Training Syllabus
PDF
AS13006 Process Control Methods – Appendix D – Guidance Materials
PDF
AS13006 Process Control Methods – Appendix E – Process Capability Plan
Excel
AS13006 Communication Package
PDF
X